Built for the Heat: How HVAC Systems Are Tested Before Handover

  • Home
  • Insights
  • Built for the Heat: How HVAC Systems Are Tested Before Handover
Ceiling ductwork and air grilles at the Palm Hills New Cairo swimming pool facility

Testing is part of the MEP services that take an HVAC installation from equipment setup to handover. Before handover, the project team needs to confirm that the system delivers the airflow and operating conditions the design calls for.

Depending on the installation, testing can include balancing airflow and water flow, verifying control sequences and checking how equipment responds during operation. The commissioning record should make it clear what was tested, what passed and what still needs attention.

For an example of the systems that can form part of a commercial installation, see MEP Construction’s Shades Mall project update. The project scope includes chillers, air-handling units, fan-coil units and ductwork. For what happens after installation, explore our testing and commissioning services.

Leave a Comment